Rubber fabrications

Industrial fabricated rubber parts

Expansion Joints

Application

  • pipe lines
  • energy powerplants

Types

  • single bellow
  • multiple bellow
  • offset
  • special constructions and dimensions

Materials

  • Neoprene
  • EPDM
  • FKM
  • Silicone
  • Butyl
  • Nitrile

Suitable for pressure & vaccum applications

Sizes

  • standard spool type – from DN 25 to DN 2000
  • spherical moulded type with floating flange – from 1″ ID to 24″ ID

Rubber ducting

Fabricated from natural and synthetic elastomers with resistance to provide the required stress relief in ducting systems due to thermal expansion, mechanical and settling movement.

Materials

  • EPDM
  • Neoprene
  • Silicone
  • Hypalon

Shapes

  • rectangular
  • circular
  • bespoke

Sizes & Methods

  • up to 2000 mm in diameter
  • up to 2000 x 2000 mm (length x width)

Air cells

Separators providing permanent, flexible and non porous barriers compensating changes in oil and other fluid volumes due to volume and temperature changes. Used inside hydraulic transformer tanks to avoid risk of accidents and damage to equipment.

  • protection against water vapour
  • suppression of air bubble formation in transformer oil
  • maintenance free
  • long service life

Materials

Air cells are made from rubber coated polyamid fabric to resist hot transformer oil, heat and ozone exposure

Dimensions

  • 825 x 3035 mm
  • 982 x 3232 mm
  • 1140 x 2620 mm
  • 1297 x 3747 mm

Other dimensions available upon request

Keeping up with COVID-19

This rapidly evolving corona-virus (COVID-19) has imposed an unsettling, fluid situation upon our community and its businesses. While the team here still aims to maintain a “business as usual” approach, we are making a number of significant changes to our operations to account for a situation that is far from normal. Governmental orders in the fight against the spread of the corona-virus (COVID-19) lead to the partial or complete closing of several production lines or designation of lines for the production of crucial parts for essential industries like food and pharma. As a direct result confirmed or usual lead times may not be met. In the current situation the delay cannot be determined. With the closing of factories in certain areas we need to make some changes to standard terms. To can keep operational and safeguard our financial position we must change certain terms. These will be announced and confirmed upon receipt of orders. Apologies for the inconvenience. Take care of yourself so you can take care of others!!